Long reach excavator arrives on the site tomorrow, Friday, March 26
- Tieback installation has been completed. For the next phase of excavation a long reach excavator will be used to dig and load hauling trucks. After it arrives on Friday, it will remain on site until the excavation crew reaches slab on grade.