by admin | Apr 27, 2021 | Construction Updates
Excavator Removal Wednesday, April 28. Small Mobile Crane Delivery Thursday, April 29. Steady progress has been made on the excavation of the site at 89 Church Street. UPDATE: The long-reach excavator, depicted in use above, will now be removed from the site on April...
by admin | Apr 23, 2021 | Construction Updates
Excavation and hauling remain the focus of work at The Saint. There will be work on site this Saturday, April 24. Next week the focus of work will remain digging out soil and then hauling away that excavated soil. The long-reach excavator will be replaced on Tuesday,...
by admin | Apr 16, 2021 | Construction Updates
Work on site Saturday, April 17. There will be crews on site to load in the long reach excavator (pictured above) that was temporarily removed on Friday afternoon. A flatbed tractor trailer will deliver the long reach excavator to the site entrance and Lombard and...
by admin | Apr 12, 2021 | Construction Updates
Excavation has reached the P4 level at the Saint. Work on the site this week will once again focus on the two key elements of the excavation process: digging out soil and then hauling away that excavated soil. The long-reach excavator, seen in the photo above, will...
by admin | Apr 5, 2021 | Construction Updates
Digging out the site continues throughout this week. Once again work on the site this week will focus on the two key elements of the excavation process: digging out soil and then hauling away that excavated soil. The long-reach excavator, seen in the photo above, will...