Long Reach Excavator arriving on site on Saturday, May 15.
Excavation work is continuing on site. Work is pressing on below the P4 level but as the soil composition is different at this level progress is steady but slower.
This Saturday, May 15, a long reach excavator is scheduled to be delivered to the site. Disruption to vehicle and pedestrian traffic should be minimal as this is a relatively quick process.
Next week on-site work will remain focused on drilling, excavating and hauling away soil off-site, as work continues toward the P5 level.
Work will continue to start at 7 am on weekdays this week.
The time work ends each day may vary but will remain within the standard City of Toronto construction hours.