Focus on some minor at-grade and interior work at the Saint.
Updates & Saturday Work
- From Friday through Saturday, and possibly extending to Monday, we exepect there will be some temporary sidewalk disruption on the east side of Church Street to facilitate some miscellaneous repair work required prior top building occupancy. A Paid Duty officer will be on-site to assist with pedestrian and vehicle access.
- The first set of unit inspections are underway.
- There will be crews on site Saturday, December 14.
- HOLIDAY HOURS:
- The site will be open Mondays through Saturdays over the holiodays except for Statutory Holidays.
This week’s construction outlook December 13 – 20:
___
-
Minor Roof work ongoing:
- Top of house (roof) curtain wall frames and related work through the week.
- All the derricks have been removed.
-
Interior work ongoing:
- Suite studs on Level 46,
- Tile on Level 30,
- Kitchens on Level 29,
- Countertops on Level 27
- Drywall and carpentry ongoing throughout the building.
Deliveries the week of December 13 – 20:
-
Concrete deliveries 1 per week, small pours
-
2 drywall
-
1 kitchen
-
1 window
-
1 carpentry
-
1 tile
-
1 countertop
-
1 appliance
-
_____________________________________________________________________________
There will be (3) Traffic Management staff and one (1) Paid Duty Police Officer will be on site to manage traffic flows this coming week.
Looking Ahead
- Move-ins to the Saint are set to begin later this month.
- The Hoist (external construction elevators) is expected to remain in place through 2024 and into early January, 2025.
- Tree planting will occur in the new year when the weather is warm enough.
- RE streetlights that are to be installed at street level:
- Toronto Hydro conducted a lighting study at the beginning of the project which was paid for by Minto. Toronto Hydro has their own schedule for replacing the previous lighting fixtures. Minto is unable to request specific type lighting design or fixtures.